Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2001 | PLUMBING - GAS PRESSURE TEST | Partial Approval | GAS PIPING FROM METER TO REGULATOR TEST OK. PLEASE COMPLETE VENT AND GAS PIPING TO UNIT. PROVIDE TEST AND CALL FOR FINAL | |
| 04/02/2001 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection 0999* 1) MUST PROVIDE AIR PRESSURE TEST OF 60LBS MINIMUM FOR 30 MINUTES SEE SEC 1204.3.2 94 UPC 2) MUST PROVIDE LISTING ON GAS SHUT OFF VALVE AT REGULATOR 3) REGULATOR MUST BE TAGGED AND SECURED NON REMOVABLE AND STATE WHAT CALLS ON SEC.1218.4 SUB NOTE #4 94 UPC 4) PROVIDE LISTING FOR REGULATOR FOR POSITION OF VENT |
|
| 03/30/2001 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection 0000* 1) CONTRACTOR NOT ON JOB AT THIS TIME. 2) PLEASE PROVIDE APPROVED PLAN ON JOB WITH TOTAL LENGTH AND TOTAL BTU'S AT TIME OF NEXT INSP. |