Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/27/2002 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) STILL WAITING FOR DECISION FROM BLDG OFFICIAL PER EXPANSIVE SOIL 2) SEE LAST INSPECTION |
| 01/29/2002 |
BUILDING - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) WAITING FOR DECISION FROM BLDG OFFICIAL, REF EXPANSIVE SOIL |
| 01/07/2002 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) AT THE BACK FLOW PREVENTER, IT IS TO CLOSE TO THE FENCE AND AFORDS A FOOT HOLD, MOVE AWAY FROM THE FENCE TO THE BRICK WALL OF THE HOUSE 2) CHECK SMALL LEAKS IN PVC AT PUMP 3) IN LIEU OF A PERMENANT SIGN, AS STATED IN THE ICBO REPORT WITH ALL THE POOL INFORMATION REQUIRED. GIVE THE POOL /HOME OWNER A TYPED SHEET WITH THAT INFO. THAT THEY CAN KEEP IN A SAFE PLACE 4) LEAK WAS VERIFIED AT TIME OF INSPECTION 5) WILL WAIT FOR ANSWER AS TO EXPANSIVE SOIL FROM DAVE MANN BEFORE I DO THE NEXT INSPECTION |
| 12/21/2001 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) 603.1 TABLE 6-1 UPC PRESSURE VACUM BREAKER WITH DUAL PORTS, REQ WITH A VALVE DOWN STREAM REF AUTO FILLER. 2.) I WILL RESEARCH THE H20 LINE MATERIAL FOR BELOW SLAB USE. 3.)CLOSER AT GATE NEEDS TO BE REPLACE OR USE DOOR SPRING. 4.) WINDOW IS SHUT OK 5.) PAINT ALL PVC. WITH LAYTER PAINT. |
| 12/19/2001 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) I BELIEVE ON A PREVIOUS INSPECTION I WROTE UP THE 3/4" LINE BECAUSE THAT IS WHAT WAS WRITTEN IN THE SLIDE INSTALLATION INSTRUCTIONS LEFT ON SITE. 2) #6 BOND WIRE SHOULD BE PROTECTED EITHER BURIED OR ATTACHED TO THE FENCE 3) I NEED THE LISTING FOR THE WATER LINE MATERIAL 4) WHERE DOES THE WATER SUPPLY FOR THE SLIDE COME FROM |
| 12/12/2001 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) CONTRACTOR NEEDS TO LEAVE ALL PREVIOUS INSPECTION REPORTS ON SITE 2) THERE IS A REGISTOR OF CONTRACTOR COMPLAINT ON GOING AT THIS TIME 3) BOND WIRE NOT COVERED 4) NO WATER TO SLIDE 5) WATER LEVELER NOT WORKING 6) WAS A QUESTION AS TO SIZE OF WATER LINE TO SLIDE AND NO WATER TEST OF SUPPLY LINE BEFORE COVERING 7) DIRT UNDER PUMP FILTER SLAB ERRODING 8) P.V.C. PIPES NOT PAINTED, AT VALVE NORTH OF SLIDE 9) NEED TO CHANGE OCCUPANCY OF BEDROOM TO OFFICE, TO ALLOW PIN AT SLIDING WINDOW. PIN WILL ALLOW WINDOW TO OPEN AT 4" 10) FINAL INSPECTION CAN'T BE DONE UNTIL THOSE ITEMS ARE COMPLETED 11) MAKE SURE THE GAP UNDER THE METAL FENCE (BARRIER) IS 4" OR LESS |
| 12/10/2001 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) GAPS UNDER FENCE OVER 4" 2) ALL GATES MUST BE SELF CLOSING AND LATCHING 3) WINDOW INTO POOL AREA FROM OFFICE CANNOT OPEN MORE THAN 4" 4) ALL COVERED W/O INSPECTION ANY PREVIOUS INSPECTION ?? |