Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2002 | GRADING - FINAL | Approved | ||
| 12/02/2002 | GRADING - FINAL | Denied | FINAL GRADING NOT APPROVED. 1) PROVIDE 8" HIGH OPENINGS IN CMU WALL AT NORTHEAST SIDE OF PROJECT. 2) REMOVE CONCRETE AND SEDIMENT FROM NEW CATCH BASIN. 3) STRIPE LOADING ZONE. 4) RE-DIRECT RAINWATER DRAIN AT STAIRWAY ON THE NORTHEAST SIDE OF THE BUILDING. RAINWATER CANNOT BE DISCHARGED ONTO SIDEWALKS. |