Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: POOL/SPA PRE-GUNITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/24/2001 |
POOL/SPA PRE-GUNITE |
|
Approved |
IVRS - Inspection 0000* |
| 08/23/2001 |
POOL/SPA PRE-GUNITE |
|
Denied |
IVRS - Inspection 0999*1.) 3" CLEARANCE REQUIRED BETWEEN REBAR & SOIL TOO CLOSE MANY PLACES 2.) VALVES BETWEEN POOL HEATER AND POOL HEATER REQUIRES TEMPERATURE/PRESSURE RELIEF VALVE. |
| 08/22/2001 |
POOL/SPA PRE-GUNITE |
|
Denied |
IVRS - Inspection 0999*/ 1) REINFORCING STEEL REQUIRES 3 INCHES CLEARANCE TO SOIL MANY AREAS TOO CLOSE 2) MAXIMUM ALLOWED SPACING OF REBAR OF 12" EXCEEDED THRU-OUT 3) NO TEST ON GAS LINE 4) P.E. GAS LINE MUST BE 18" BELOW GRADE |