Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2006 | GRADING - FINAL | Not ready for Inspection | MET WITH CONTRACTOR, AND JOSE ORTIZ FROM DSD, AGREED UPON BASIN MODIFICATION REQUIRED ON SITE IN ORDER TO ADDRESS PROBLEMS WITH STORM WATER DRAINAGE. 1) GROUTED RIP RAP REQUIRED ON TWO SIDE SLOPES OF BOTH BASINS. 2) RAILING REQUIRED ON 1:1 SLOPE SIDE OF BOTH BASINS. 3) INSTALL WEEP HOLES THROUGH BLOCK WALL AT LOCATIONS DISCUSSED ON SITE. 4) ENSURE DRAINAGE FRON PARKING LOT MAKES IT TO CURB OPENING AND IS DIVERTED INTO EACH BASIN. OTHER ISSUES ON SITE DELT WITH A 4' PED ACCESS, AND A 10' RADIUS AT ENTRANCE TO SITE. |
|
| 06/21/2002 | GRADING - FINAL | Denied | SITE WORK HAS NOT BEEN STARTED AT THIS TIME, UTILITY INSTALLATION CONTINUES |