Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2001 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection 0000* | |
| 05/04/2001 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* NOT READY | |
| 05/03/2001 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* 1) WHERE THE WALL IS CLOSE TO THE EXSISTING CONCRETE CURB, ONE OF THE VERTICLE'S TAILS IS TO BE POINTING TOWARD THE CURB. THE TWO TAILS ARE TO POINT IN DIFFERENT DIRECTIONS. SEE DETAIL 1 ON PAGE SP3 2) REMOVE THE INSULATED PIPE 3) FOOTING NOT 1'-0" THICK IN ALL PLACES 4) HAVE THE ENGINEER TO REVIEW THE EXSISTING LIGHT STANDARDS IN THE FOOTING 5) REMOVE LOOSE DIRT |