Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T01BU00557

Parcel: 132171340

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
05/07/2001 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection 0000*
05/04/2001 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection 0000* NOT READY
05/03/2001 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection 0000* 1) WHERE THE WALL IS CLOSE TO THE EXSISTING CONCRETE CURB, ONE OF THE VERTICLE'S TAILS IS TO BE POINTING TOWARD THE CURB. THE TWO TAILS ARE TO POINT IN DIFFERENT DIRECTIONS. SEE DETAIL 1 ON PAGE SP3 2) REMOVE THE INSULATED PIPE
3) FOOTING NOT 1'-0" THICK IN ALL PLACES
4) HAVE THE ENGINEER TO REVIEW THE EXSISTING LIGHT STANDARDS IN THE FOOTING 5) REMOVE LOOSE DIRT