Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/25/2003 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
PERMIT # T01EL01716 WAS ISSUED 7/2/01 FOR SERVICE NEW METER. CASE WAS CLOSED ON 9/10/01. MET RICK HOLLANDER ON SITE ON 3/20/02 BECAUSE HE THOUGHT MORE WORK WITHOUT PERMITS MAY HAVE BEEN TAKING PLACE BECAUSE OF SOME BUILDING MATERIALS BEING STORED ON SITE. CASE WAS CLOSE ON 9/10/01 BUT NEVER CLOSED IN SYSTEM. |
| 03/20/2002 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
WAS CALLED TO SITE BY RICK HOLLANDER: MET WITH OWNER ON SITE. PLANS TO BUILD PORCHES IN THE FUTURE. SOME MATERIALS ON SITE. OWNER BUYING MATERIALS IN SECTIONS AND STORING AT THIS TIME. OWNER UNDERSTANDS PERMITS MUST BE ISSUED BEFORE WORK TO BE DONE. NO VIOLATIONS AT THIS TIME. |
| 09/10/2001 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
PERMIT #T01EL01716 FOR SERVICE UPGRADE ALL OTHER REPAIRS COMPLETED. CLOSE CCASE. |
| 07/27/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
ELECTRICAL PERMIT ISSUED #T01EL01716 ON 07-02-01. ALL OTHER REPAIRS COMPLETED. INSTALLED 100 AMP NEW SERVICE. F/U ON 09-10-01 |
| 06/27/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
MET WITH OWNER. DECIDED TO INSTALL NEW SERVICE TO BACK UNIT. WILL PULL PROPER PERMITS. UNDERSTANDS MUST HIRE LICSENCED CONTRACTOR. F/U 07-27-01 |
| 06/18/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
NO ONE HOME 3:30 |
| 04/05/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
MET WITH OWNER IN PROCESS OF FINISHING BLUEPRINTS FOR PERMITS.F/U SCHEDULE 6-5-01 |
| 02/23/2001 |
FOLLOW UP CODE VIOLATION |
|
Closed |
GOT CALL FROM OWNER. WILL NEED MORE TIME. HAS HIRED CONTRACTOR TO DO ELECTRICAL WORK NEEDED. F/U 3./23/2001. |
| 01/14/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
SMOKE DETECTORS INSTALLED AT THIS TIME.OWNER TO PULL CODE COMPLIANT PERMIT FOR ALL WORK NEEDED.F/U 2/13/01. |
| 01/08/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
MET WITH OWNER. MUST INSTALL 2 EACH SMOKE DETECTORS WITHIN 24 HOURS.T&P LINE AT WATER HEATER PROPERLY EXTENDED.NO CENTRAL HEAT AT THIS TIME.OWNER TO INSTALL NEW GAS HEATER IN LIVING ROOM. AGREED TO PULL ALL NECESSARY PERMITS. IN PROCESS OF GETTING ELECTRICAL BIDS ON MAIN POWER HOOK-UP. |