Inspection History Details
Inspection Status: Compliance
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/18/2001 | INITIAL CODE VIOLATION | Compliance | ALL REPAIRS MADE BY NEW OWNER--CLOSE | |
| 01/04/2001 | INITIAL CODE VIOLATION | Correction Required | ALL ITEMS ARE REPAIRED AS NEEDED, THERE IS ONE SMALL ITEM LEFT,,LIGHT SWITCH. F/U SCHEDULED 1-16-01 | |
| 12/23/2000 | INITIAL CODE VIOLATION | Correction Required | roof is now secure from pigeons/// elect.work pending completion.. |
|
| 12/07/2000 | INITIAL CODE VIOLATION | Correction Required | PIGEONS ARE ENTERING THUR-ROOF.BATHROOM LIGHT SWITCH IS INSTALL IN A MESS OF PHONE WIRES,STORAGE ROOM/HALL LIGHT SWITCH IS NOT WORKING,/MAIN OFFICE ROOM LIGHTS WILL NOT TURN OFF AT SWITCH-ONLY AT BREAKER BOX--I DID TALK TO OWNER,,,F-U 15 DAYS | |
| 11/30/2000 | INITIAL CODE VIOLATION | Correction Required | ELECT WIRES EXPOSED |