Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Closed
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/13/2000 |
FOLLOW UP CODE VIOLATION |
|
Closed |
ALL REPAIRS ARE MADE. CLOSE CASE |
| 12/07/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
WORK IN PROGRESS-SHEETROCK WORK ALMOST DONE/SOME WOOD WAS ALSO REPLACED,DUCTS ARE CLEANED OUT F-U 5DAYS. |
| 11/30/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
CLOSET IS REPAIRED. ROOF ABOVE BEDROOM IS REPLACED-JUST SCRAPED PAINT OFF & RE-PAINTED.BATHROOM STILL NO IMPROVEMENT SAME FOR HALLWAY. F/U SCHEDULED FOR 12-06-00. |
| 11/27/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
REPAIRS ARE BEING MADE AT THIS TIME. F/U SCHEDULED FOR 11-30-00. |
| 11/16/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
FOUND MOLD THROUGHOUT, BATHROOM HAS WATER DAMAGE 2 DAY FU 11-21-00 |