Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Closed
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/04/2000 |
FOLLOW UP CODE VIOLATION |
|
Closed |
VIOLATION ABATED CLOSE CASE |
| 11/28/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
F/U SCHEDULED FOR 12-04-00 |
| 11/22/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
DEMOLITION HAS STARTED. ELECT HAS BEEN DISCONNECTED. F/U SCHEDULED FOR 11-28-00. |
| 11/15/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
NO PERMITS WILL BE NEEDED TO TEAR DOWN UNSTABLE STRUCTURE. 7 DAYS TO REMOVE.F/U SCHEDULED FOR 11-22-2000 |
| 11/07/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
TALKED TO GEORGE TODAY, 5 MORE DAYS TO APPLY FU ON 11-15-00 |
| 10/30/2000 |
FOLLOW UP CODE VIOLATION |
|
Violation |
INSPECTOR SPOKE TO OWNER-(GEORGE) AND STATED THAT HE NEEEDS 7 MORE DAYS. F/U SCHEDULED FOR 11/6/00. |
| 10/30/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
5 MORE DAYS GIVEN TO GET PERMITS 5 DAY FU 11-09-00 |
| 10/13/2000 |
FOLLOW UP CODE VIOLATION |
|
Violation |
F/U SCHEDULED FOR 10/30/00 |
| 10/13/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
AWNING OUTSIDE LAUNDRY ROOM NEEDS TO BE REMOVED. F/U SCHEDULED 10-27-2000 |