Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2000 | INITIAL CODE VIOLATION | Correction Required | PRIORITY 2 PER C-2 PATIO ROOF BEING BUILT AS WIDE AS THE HOUSE WOP, 2 X 4 JOISTS, LEDGERED TO FACSIA, 4X4 BEAMS, NO CONCRETE INSPECTIONS |