Case: T00VL01308

Parcel: 13415002A

Inspection Status: Closed

Inspection History: FOLLOW UP CODE VIOLATION

Case Number - T00VL01308

Inspection Description - FOLLOW UP CODE VIOLATION

Inspection Status - Closed

Date Description Inspector Results Comments
05/09/2001 FOLLOW UP CODE VIOLATION Closed ALL REPAIRS TO HANDRAILS AND DECK COMPLETED. IN PROCESS OF PAINTING. VIOLATION ABATED. CLOSE CASE.
03/05/2001 FOLLOW UP CODE VIOLATION Correction Required MET WITH MAINTENANCE RON IN PROCESS OF DOING REPAIRS TO HANDRAILS & DECK.NEEDS MORE TIME.F/U SCHEDULE 5-7-01
01/12/2001 FOLLOW UP CODE VIOLATION Correction Required ROOF LEAK IN 537 HAS BEEN PATCHED. MET WITH RON.HAND RAILS TO BE REPAIRED IN-HOUSE.
01/06/2001 FOLLOW UP CODE VIOLATION Correction Required MET WITH MANAGER AND MAINTENACE SUPER.REPAIRS TO ALL HAND RAILS ON ALL THREE LEVELS TO BE REPLACED.BUDGET FROM PAUL ASH WAS APPROVED AND REPAIRS HAVE BEGUN.F/U 2/20/2001.
12/05/2000 FOLLOW UP CODE VIOLATION Correction Required MET WITH MANAGER (BOBBI) AND MAINTENANCE SUPER (RON).ROOF REPAIRS PROPERLY COMPLETED IN APT 537.REPAIRS TO HAND RAILS AND DECKING IS STILL IN BID PROCESS.REPAIRS WILL BE DONE WHEN BIDS ARE FINAL.F/U 1/4/01.
09/13/2000 FOLLOW UP CODE VIOLATION Correction Required DSD, SERVED MGMT ON SITE WITH NOTICE & ORDR ALLOWING 15-DAYS TO DO REPAIRS TO WALKWAYS.
09/12/2000 FOLLOW UP CODE VIOLATION Correction Required INSPECTION FOUND THAT MGMT HAS REPAIRED LEAK ON ROOF WITH WATER FROM HOSE RUNNING TO CHECK FOR LEAK. TENANT WAS PRESENT ACCORDING TO MGMT AND TENANT DID CONFIRM THIS OVER PHONE EARLIER. WALKWAYS WERE PATCHED TEMP.