Case: T00VL01246

Parcel: 13817016A


Addresses:

415 E CORONA RD

Inspection Status: Closed

Inspection History: FOLLOW UP CODE VIOLATION

Date Description Inspector Results Comments
06/05/2001 FOLLOW UP CODE VIOLATION Closed PERMIT ISSUED T01CM01724 ON 4-19-01. VIOLATION ABATED. CASE CLOSED.
04/21/2001 FOLLOW UP CODE VIOLATION Violation PERMIT HAS BEEN ISSUED/T01CM01724. BUT HAS NO MECHANICAL OR PLUMBING. F/U 05-03-01.
04/06/2001 FOLLOW UP CODE VIOLATION Violation FLOOR PLAN AND INDICATE REPAIRS.
04/04/2001 FOLLOW UP CODE VIOLATION Violation OWNER HAS STARTED ELECT. WORK.
03/23/2001 FOLLOW UP CODE VIOLATION Violation TRAILER STILL IS VACANT & BEING WORKED ON. TALKED TO MANAGER BY PHONE.F/U SCHEDULE 4-6-01.
02/23/2001 FOLLOW UP CODE VIOLATION Violation STILL WORKING ON TRAILER & NEW OWNER NEEDS MORE TIME.F/U SCHEDULE 3-15-01
01/26/2001 FOLLOW UP CODE VIOLATION Violation TALKED TO MANAGER & GOING TO GET OTHER ELECTRICIAN.F/U SCHEDULED 2-15-01
01/22/2001 FOLLOW UP CODE VIOLATION Violation MET WITH MANAGER & WILL MEET WITH NEW TENANT & ELECTRICAN AT SITE FRIDAY 1-26-01 AT 8:30AM
11/29/2000 FOLLOW UP CODE VIOLATION Violation MET AT SITE WITH MANAGER & UNABLE TO GET INTO TRAILER. NO KEY W/MANAGER CALLED & LEFT MESSAGES WITH OWNER. F/U SCHEDULED FOR 12-05-00.
11/16/2000 FOLLOW UP CODE VIOLATION Violation CALLED & NOT READY
11/03/2000 FOLLOW UP CODE VIOLATION Violation CALLED & NOT READY
09/19/2000 FOLLOW UP CODE VIOLATION Violation 45 DAY F/U SCHEDULED FOR 11/3/00.
08/30/2000 FOLLOW UP CODE VIOLATION Violation CALLED TO MEET W/OWNERS. WAS GOING TO REPAIR EVERTHING. 20 DAY FOLLOW UP SCHEUDLED FOR 9/19/00.