Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
Case Number - T00VL01217
Inspection Description - INITIAL CODE VIOLATION
Inspection Status - Correction Required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2000 | INITIAL CODE VIOLATION | Correction Required | EMERGENCY CALL OUT DUE TO CAR INTO BUILDING PER INSPECTOR MONAHAN UTILITIES WERE DISCONNECTED BY TEP. DAMAGES WERE NEED TILE AND WATER RESISTANT DRYWALL INSTALLED. NOTICE AND INDEMNIFICATION WAS SIGNED BY OWNER. NO DAMAGE REPORT RECEIVED. FOLLOW UP SCHEUDLED FOR 09/05/00.RETURNED PACKET TO TICKLER FILE |