Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2000 | INITIAL CODE VIOLATION | Correction Required | 6/20/00 PRIORITY 3 CONSTRUCTION OF A STORAGE SHED WITHOUT PERMITS. SITE VISIT TO FOLLOW. |