Inspection Status: Not ready for Inspection
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/31/2000 |
INITIAL CODE VIOLATION |
|
Not ready for Inspection |
OWNER CALLED ON 8/28 TO SAY HE IS LOOKING FOR THE MECHANIC WHO INSTALLED THE SYSTEM. HE ASKED FOR AN EXTENSION. GRANTED TILL 10/28 |
| 08/22/2000 |
INITIAL CODE VIOLATION |
|
Correction Required |
NEW OWNERS HAD NEW MECHANICALS INSTALLED ON THE ROOF ALONG WITH NEW DUCT WORK. INFORMED HIM TO GET A PERMIT AND HAVE IT INSPECTED BY A MECHANICAL INSPECTOR. THIS CONTACT WAS ON 8/21 |
| 08/17/2000 |
INITIAL CODE VIOLATION |
|
Correction Required |
6/19/00 LARGE SOLAR SYSTME BEING INSTALLED WITHOUT PERMITS. |