Inspection Status: Correction Required
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/25/2000 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
ADDTL COMMS - 5/25/00 THIS CASE WAS ORIGINALLY ASSIGNED TO INPSPECTOR R.CHAVEZ BUT HAS BEEN RE-ASSIGNED TO INSPECTOR F.GREER. HE HAS GONE OUT ON A SITE VISIT INSPECTION AND BUILDING IS SECURED. WILL FOLLOW UP IN 90 DAYS. |
| 05/25/2000 |
FOLLOW UP CODE VIOLATION |
|
Violation |
VIOLATION |