Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T00PL01485

Parcel: 116060440


Addresses:

1540 N PAVO PL

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
11/14/2000 PLUMBING - GAS PRESSURE TEST Approved
09/25/2000 PLUMBING - GAS PRESSURE TEST Partial Approval TEST OK CORRECTIONS HAVE BEEN MADE AS PER LAST REQUEST. OK TO BACKFILL.
GAS FOR POOL HEATER ONLY. EXISTING METER ON AT THIS TIME
09/21/2000 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection 0999*
PRESSURE TEST OK WILL NEED TO RETEST AFTER CORRECTIONS ARE MADE
ALL GAS PIPING FROM 6" AFF AND BELOW SHALL BE PROTECTED WITH MACHINE APPLIED COATING
WRAPPING WITH 10 MIL TAPE IS RESTRICTED TO THOSE FITTINGS AND SHORT SECTIONS WHERE THE FACTORY WRAP HAS BEEN DAMAGED OR NECESSARILY STRIPPED FOR THREADING. WRAPPED BLACK IRON PIPE IS NOT ACCEPTABLE