Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - PROGRESS
Permit Number - T00PL01442
Inspection Description - PLUMBING - PROGRESS
Inspection Status - Partial Approval
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2001 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection 0000*TEST ON 2" PRESSURE MAIN. | |
| 06/06/2001 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection 0000*FROM C.O. #1 TO LEACH FIELD DISTRIBUTION VALUE.TEST OK ON 2' FORCE MAIN.ALSO WATER TEST ON HCS FOR BUILDING #19. 20, 21,22 TEST OK.ALSO 6" EFFLUENT BIO FILTERS HAVE BEEN INSTALLED.PLEASE NOTE NEED VARIFICATIONS OF GRAD BY FINAL.NO BACK WATER HAVE BEEN INSTALLED. |
|
| 05/03/2001 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection 0000* EASTERN CLUSTER: 1) 3' MANHOLE OK 2) PRESSURE PIPE FROM CO #19 TO 1000 GAL TANK WITH PUMP. DETAIL C SHEET 3 TEST ON 2" OK NEED APPROVED REVISED PLAN 24" OVERFLOW TRENCH WITH 3" ABS AT TANK A SHEET 2 NEED TO INSTALL BIO FABRIC OK TO COVER |
|
| 04/25/2001 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection 0000* 1) EASTERN CLUSTER? WHO IS INSTALLING BACK WATER VALVES AND 1000 GAL GREASE TRAP NOT INSTALLED AT THIS TIME AND SEPTIC TANK. 2) 3' DIA. MAN HOLE NOT INSTALLED AT THIS TIME 3) TEST OK ON 2" PRESSURE LINE FROM CO #19 TO CO #9. 4) WATER TEST OK ON 6" SDR 35 AND IT BRANCHES FROM CO #15 TO CO #19. OK TO BACKFILL SUBJECT TO VERIFICATION OF GRADE. DIP PIPE INSTALLED AT WATER CROSSING CALL WHEN READY FOR MANHOLE AND TANKS |
|
| 04/19/2001 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection 0000* FROM C.O. #1 TO C.O. #9 - TO TANK TEST OK. PLEASE PROVIDE VARIFICATION OF GRADE BY NEXT INSP. PLEASE PROVIDE APPROVED REVISED PLANS ON 2" PRESSURE PIPE WITH TEC? TEST OK NEED APPROVED PLAN. NOTE: C.O. REQUIRED ON 135 DEGREE CHANGE IN DIRECTION | |
| 04/16/2001 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection 0000*NOTE: WILL NEED AN APPROVED REVISED PLAN BY NEXT INSP. 1) PLEASE PROVIDE APPROVED AS BUILD DRAWINGS 2) SECTION BETWEEN TWO SETS OF SEPTIC TANKS TEST OK. PLEASE PROVIDE VARIFICATION OF GRADE ON THIS SECTION. 3) 2" PRESSURE PLEASE PROVIDE APPROVED REVISED PLAN BEFORE NEXT INSP. |
|
| 04/12/2001 | PLUMBING - PROGRESS | Partial Approval | TEST OK ON 6" FROM 14+14.34 TO 14+88.96 SUBJECT TO APPROVED REVISED PLANS | |
| 04/11/2001 | PLUMBING - PROGRESS | Not ready for Inspection | ||
| 04/10/2001 | PLUMBING - PROGRESS | Not ready for Inspection | NO ONE AT JOB SITE | |
| 04/06/2001 | PLUMBING - PROGRESS | Not ready for Inspection | ||
| 04/03/2001 | PLUMBING - PROGRESS | Partial Approval | FROM CO #11 TO CO #14 HAVE LETTER FOR THIS SECTION ONLY VARIFICATION BY PRE. TEST OK AT THIS TIME . WILL NEED APPROVED REVISED PLAN FOR STATION SECTION 15+17.26 TO STATION 13+82.13 BEFORE APPROVAL CAN BE GIVEN | |
| 03/27/2001 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection 0000* 1) WILL REQUIRE VERIFICATION OF GRADE 2) LISTING ON TANKS 3) PROVIDE ACCESS TO APPROVED PLAN AT TIME OF INSP. 4) NEED INFO FROM WASTE WATER |