Permit: T00PL01105


Addresses:

1173 W IRVINGTON RD

Inspection Status: Approved

Inspection History: PLUMBING - SEWER HCS CONNECT

Date Description Inspector Results Comments
04/10/2001 PLUMBING - SEWER HCS CONNECT Approved IVRS - Inspection 0000*
04/09/2001 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000* 1) BACK WATER VALVE AND PIT NEXT TO MANHOLE #4 OK-STILL NEED TO TEST
2) CONNECTIONS (2) WEST OF BACK WATER VALVE AND CLEAN OUT OK
04/06/2001 PLUMBING - SEWER HCS CONNECT Not ready for Inspection
04/05/2001 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000* 1) BLDG DRAIN FOR 1225 W IRVINGTON RD TO BLDG SEWER UNDER THIS PERMIT OK TO MANHOLE 2) WATER TEST OK
3) OK TO RELEASE WATER TEST 4) NW HCS/SEWER CONNECTION FROM MANHOLE THROUGH CURB TO PREVIOUSLY INSPECTED SEWERS OK 5) FROM MANHOLE IN SANTA CRUZ RD THROUGH MANHOLE
#1 TO MANHOLE #2 OK WATER TEST OK
03/28/2001 PLUMBING - SEWER HCS CONNECT Not ready for Inspection IVRS - Inspection 0000*
03/26/2001 PLUMBING - SEWER HCS CONNECT Not ready for Inspection IVRS - Inspection 0000*
03/23/2001 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000* 1) MANHOLE #5 SET IN PLACE MANHOLE #6 BASE POURED 2) BLDG TIE IN #14, 13, 12, 11, OK AIR TEST IN FUTURE 3) WATER TEST MANHOLE #1,2,3 WATER LEVEL RECORDED 3-23-01 CHECK TEST 3-26-01
03/22/2001 PLUMBING - SEWER HCS CONNECT Not ready for Inspection IVRS - Inspection 0000*
03/21/2001 PLUMBING - SEWER HCS CONNECT Not ready for Inspection IVRS - Inspection 0000* NOT READY
03/19/2001 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000* BLDG #15 & 16, 1) SDR BLDG SEWER TO MANHOLE OK WATER TEST IN FUTURE
2) REMEMBER LETTERING UP PLEASE 3) OK TO COVER
03/16/2001 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000* 1) FROM MANHOLE IN CALLE SANTA CRUZ SEWER OK PAST MANHOLE #2 AND 20' PAST MANHOLE #3 TO BE TESTED AT A LATER DATE
2) OK TO BACKFILL
03/15/2001 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000* 1) MANHOLE TAP IN CALLE SANTA CRUZ, CURB, AND TAP OK. 2) SEWER TO EAST SIDE OF CURB OK 3) OK TO BACKFILL FROM MANHOLE TO CURB
03/14/2001 PLUMBING - SEWER HCS CONNECT Not ready for Inspection IVRS - Inspection 0000*
03/13/2001 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000* BLDG 8 - SEWER TO MANHOLE OK. MANHOLE TAP AT BOTTOM OK. NEED TO CONSTRUCT CURB INSIDE MANHOLE. OK TO BACK FILL. LOT 3 - SEWER TIE IN TO MAIN OK. OK TO BACKFILL. LOT 4 - SEWER TAP OK. NEED TO WATER AND BUILD CURB. OK TO COVER. BLDG 4N - 2 SEWER STUBS ONE NORTH AND ONE SOUTH OK. BLDG 5S - OK TO BACKFILL. BLDG 6 - SEWER CLEANOUTS AND TIE INS OK. BLDG 7 - OK TO BACKFILL
03/12/2001 PLUMBING - SEWER HCS CONNECT Not ready for Inspection IVRS - Inspection 0000* NOT READY