Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 02/14/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - TEST OK CORRECTIONS HAVE BEEN MADE TO EXISTING FIXTURES CALL GAS CO 889-1888 |
| 02/11/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. REMOVE 3/4 UNION AND CONNECT SOLID OR INSTALL AGA GAS VALVE BELOW UNION BLDG ENTRY 2. USE AGA ON ALL GAS APPLIANCES 3. RUN P&T 3/4 TO OUTSIDE 4. REMOVE VALVE NEW H.W. HEATER CONNECT SOLIDS INSTALL SEPERATE VALVE TO HWH TEST ALL SYSTEM 5. INSTALL ROOF JACKS |
| 02/11/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0000* |