Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2000 | MECHANICAL - FINAL | Approved | IVRS - Inspection 0000* CORRECTIONS LOOK GOOD |
|
| 11/20/2000 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection 0000* | |
| 11/15/2000 | MECHANICAL - FINAL | Partial Approval | PVC CONDENSATE DRAIN LINE NEEDS TO BE PAINTED W/ SYNTHETIC LATEX PAINT TERMINATE OVER WET SEWER VENT W/3/4" PVC TEE, NOT A 90 DEGREE ELL. HI VOLTAGE SWITCH. PLUG KNOCK OUT OPENING LOWER RIGHT SIDE OF BOX DUCT WORK PUT BRACE, DUCT TO ROOF. RELINE TENSION ON FLEX DUCT CONNECTOR CORRECT AND RECALL |