Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
Permit Number - T00ME00570
Inspection Description - MECHANICAL - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2007 | MECHANICAL - FINAL | Approved | REFERENCE T04ME00007. | |
| 08/22/2000 | MECHANICAL - FINAL | Denied | IVRS - Inspection 0999* PAINT ALL EXPOSED PLASTIC PIPE WITH LATEX PAINT THIS INCLUDES THE PVC STRAPED TO THE BLOCK WALL EVEN IF IT IS EXISITNG PIPE |
|
| 07/11/2000 | MECHANICAL - FINAL | Denied | IVRS - Inspection 0935 NO CORRECTIONS HAVE BEEN MADE PAY RE-INSPECTION FEE. RECALL WHEN WORK IS COMPLETE* |
|
| 06/26/2000 | MECHANICAL - FINAL | Correction Required | ADDTL COMMS - 1. INSULATION ON CHILLED WATER PIPE IS NOT COMPLETE. INSULATE 90 DEGREE ELBOWS AND REPAIR INSULATION THAT IS FALLING APART. EXPOSED INSULATION MUST BE WEATHER PROOF 2. PAINT ALL EXPOSED PVC WITH WATER BASE LATEX PAINT. SPRAY PAINT WILL NOT BE ACCEPTED. 3. PUMP MOTOR ON COOLING TOWER NEEDS TO BE MOUNTED AND ANCHORED. CORRECT AND RECALL FOR FINAL. | |
| 06/26/2000 | MECHANICAL - FINAL | Denied | IVRS - Inspection 0999* |