Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
Permit Number - T00EL01988
Inspection Description - ELECTRIC - SERVICE UPGRADE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2000 | ELECTRIC - SERVICE UPGRADE | Approved | ||
09/20/2000 | ELECTRIC - SERVICE UPGRADE | Partial Approval | IVRS - Inspection 0000* OK TO CLEAR TEMP POWER FOR CHANGE OVER ON NEW SERVICE 1. EXAPORATIVE COATING MACHINE 2. STAND ALONE POWER SUPPLY - NOT LISTED PROVIDE INFO WHICH LIST BOTH PER NEC 1999 SECTION 110-3 NOT TO BE ENERGIZED UNTIL VERIFIED |
|
09/19/2000 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection 0999* IMPROPER CLEARANCE BELOW CT CAN 110-26 99 NEC REQUIRES ANY EQUIPMENT WHICH IS REQIRED TO BE INSPECTED OR EXAMINED TO HAVE CLEARNCE ALL THE WAY BELOW IT AND 3' IN FRONT TO GRADE TRANSFORMERS NOT GROUNDED TO NEUTRAL, NO BOND JUMPER TO NEUTRAL HIGH LEG FOR THIS SYSTEM IS TO BE ON B PHASE AFTER CT CAN NEW 100 AMP PNL HAS HIGH LEG EQUIPMENT TO BE LISTED AND APPROVED PER ELECT CODE 99 SECTION 110- THIS ITEM PERTAINS TO OWNER AND EQUIPMENT HE IS CONNECTING THE LISTING HAS TO BE FOR ENTIRE UNIT NOT JUST CN NEED TO INSTALL WATER AND GAS BOND AT SERVICE IF GAS NOT AVAILABLE DO NOT HAVE TO BOND |
|
09/14/2000 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection 0999* 1. DRIVER RODS FLUSH OR BELOW GRADE 2. IMPROPER CLEARANCE IN FRONT OF C.T CAN PLANTER AND ROD 3. CONDUCTOR BONDING RISER TO C.T. CAN IS UNDER SIZED (SEE SUPPLY SIDE BONDING) 4. A GROUNDING BUSHING AND BONDING JUMPER IS REQUIRED ON ALL (SUPPLY SIDE) SERVICE EQUIPMENT NIPPLES (BOTH SIDES) 5. RIVET OR SCREW ADDRESS TAG 6. PERMANENTLY IDENTIFY ALL SERVICE DISCONNECTS, TRANSORMER DISCONNECTS, TRANSORMERS, PANELBOARDS, FEEDER CIRCUITS AND BRANCH CIRCUITS 7. THE 45 KVA TRANSLORMER WAS PLACED IN FRONT OF IT'S OWN DISCONNECT 8. OPEN TRANSFORMER ON NEXT CALL 9. ALL EQUIPMENT TO BE LISTED AND LABLED |