Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T00CM06173

Parcel: 141113170

Inspection Status: Approved

Inspection History: FRAMING

Permit Number - T00CM06173

Inspection Description - FRAMING

Inspection Status - Approved

Date Description Inspector Results Comments
03/08/2001 FRAMING Approved IVRS - Inspection 0000*
03/07/2001 FRAMING Denied IVRS - Inspection 0999*/1. NEED A 3-2 X 4 POST ON WEST SIDE OF STAIRS TO SUPPORT 3 X 15 GLUE LAM-PER PLAN. 2. SECURE 4 GANG BOX-2ND FLOOR NORTH OF STAIRS. 3. CUT OSB AWAY FROM BACK SIDE OF FLUE-N.E. ROOF. 4. SUPPORT 90 DEGREE VENT ABOVE 2ND FLOOR HALL TUB. 5. SHIM KING STUDS AND HEADER AT SOUTHEAST 2ND FLOOR OCTOGON WINDOWS. 6. CORRECT SAG IN CONDENSATE DRAIN LINES.