Permit: T00CM05949

Parcel: 137337040

Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
02/08/2001 FRAMING Approved IVRS - Inspection 0000*
02/06/2001 FRAMING Partial Approval IVRS - Inspection 0000*/1. PROVIDE A POSITIVE FLOW FOR SECONDARY DRAIN FOR CONDENSATE LINE. 2. PROTECT ELECT. ROMEX AT HALL BATH CLOSET. 3. PROVIDE 36" CLEARANCE FROM SMOKIE TO AIR VENT. 4. REMOVE COMBUSTIBLE MATERIAL FROM HOT WATER FLUE PIPE. 5. STUB OUT GAS LINE TO WITHIN 36 INCHES OF FURNACE. 6. SEAL FLOOR PENETRATIONS FROM INFILTRATION.
02/05/2001 FRAMING Partial Approval IVRS - Inspection 0000*