Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T00CM05890
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2000 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection 0000* | |
| 12/19/2000 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999*/1. CHICAGO LOOP NOT APPROVED 2. STAKE HORIZONTAL BRANCHES OR PROVIDE SHADING. 3. A RE INSPECTION FEE WILL BE IMPOSED IF CALLED IN AGAIN WITHOUT CHANGES. 4. PROVIDE SAN TS AND CLEANOUTS AT ROUGH SOIL OR RE TEST ALL STACKS AT INTERMEDIATE DRAINS. | |
| 12/18/2000 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999*/1. CHICAGO LOOP NOT INSTALLED CORRECTLY. SEE UPC SPECIAL VENT SYSTEMS OR PROVIDE AN AIR ADDMITTANCE APPLICATION. 2. POSITIVELY SUPPORT HORIZONTAL BRANCH LINES AT TUB/SHOWER AND SEWER CONNECTION. 3. OK TO BACK FILL PLUMBING YARD WATER NO TEST. |