Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/08/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 03/07/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/1. DETIAL 6/SD2 IN PROGRESS. 2. NAIL 2ND FLOOR SOLE PLATE 12" OC. 3. POST UNDER 2 X 12 BOTH SIDES . 4. ALTERNATIVE HOLDOWN AT ENTRY NOT IN STALLED. 5. PROTECT CONDENSATE LINE WITHIN 1 1/4 FROM EDGE OF SOLE PLATE AND DBL TOP PLATE. |
| 03/05/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/1. INSULATION AT GARAGE ENTRY LID NOT INSTALLED. 2. SUPPORT REQUIRED UNDER VTR 90 DEGREE ANGLES. 3. HOLDOWN IN FRONT NOT INSTALLED "ALTERNATIVE METHOD". 4. PROTECT ABS 45 DEGREE ANGLE BEHIND GARAGE OSB WALL. 5. PROVIDE TWO ANCHOR BOLTS AT SOLE PLATE SUPPORTING GLU LAM. 6. HEADER IN BATHROOM ENTRY FIRST FLOOR NOT COMPLETE. 7. SECURE SINGLE GIRDERS AS PER PLAN POST AND TIES. |