Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/12/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
1.) SOIL WATER TEST IS OK 2.) WASTE & VENT SYSTEM IS OK 3.) OK TO BACKFILL TRENCH. 4.) MUST WRAP ALL WASTE LINE'S IN FOOTER PRIOR TO PRE SLAB. 5.) NOTE: BLDG. DRAIN IS STUBBED OUT @ 2 - WAY C.O. ONLY. |
| 02/11/2002 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*1.) CAN NOT USE DBL COMBO IN A HORIZONTAL POSITION SEC SECTION 708 94 UPC 2.) CAN NOT USE FLAT FACED BUSHINGS IN HORIZONTAL DRAINAGE SEC SECTION 311.5 94 UPC USE BELL REDUCERS.3.) SYSTEM HAS LEAK @ BUSHINGS 4.) MUST WRAP ALL WASTE LINES IN FOOTERS. |