Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/23/2001 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000* |
| 10/18/2001 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*/ 1) PLUMBING IS NOT PER PLAN CALLS FOR DRAIN/SEWER LINE TO BE EXTERNAL OF BUILDING. ALL PLUMBING IS UNDER SLAB. BUILD TO PLAN OR REVISE PLAN TO AS BUILT AND HAVE APPROVED BY THE CITY OF TUCSON 2) ROUGH PLUMBING REQUIRES A 10 FOOT WATER COLUMN TEST 3) BACK WATER VLAVES MUST BE ACCESSIBLE-EXTEND TO GRADE OR PROVIDE ACCESS/MANHOLE 4) PLAN SHOWS A SEPARATE SEWER TAP AT HCS. BOTH HOUSES ON ONE TAP MUST BE APPROVED BY CITY OF TUCSON. 5) WHY DO YOU HAVE BACK WATER VALVES? HOUSE IS OVER 1' ABOVE MANHOLE, REMOVE IF NOT REQUIRED |