Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/11/2001 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000$ |
| 07/09/2001 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) MAXIMUM ALLOWANCE DEVIATION IN STAIR RISE IS 3/8" FIRST STEP 3 1/4", SECOND 2 1/2, THIRD 2 1/8, FOURTH 7", FIFTH 6 13/16", SIXTH 6 7/8", SEVENTH 7 1/4", EIGHT 8 1/8" 2) WATER HEATER T&P LINE CANNOT HAVE A TRAP BEND 3) EXISTING BEDROOMS AND ROOM/HALL LEADING TO BEDROOM MUST HAVE AT LEAST BATTERY OPERATED SMOKE DETECTORS |