Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2000 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection 0000* | |
| 12/13/2000 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* NOTES BOND BUSHINGS OR BONDING TYPE LOCKNUTS REQUIRED ON BOTH ENDS OF ALL CONDUIT TERMINATIONS ON SERVICE RELATED ENCLOSURES 250-94 N.E.C. BOND NEUTRAL ON GENERATOR SIDE OF TRANSFER SWITCH 250-30 NEC |