Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2015 | ENGINEERING - FINAL | Approved | ||
| 06/18/2008 | ENGINEERING - FINAL | Partial Approval | SEE PREVIOUS COMMENTS AND PROVIDE AN APPROVED PLAN FOR ALL OF THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. | |
| 04/09/2003 | ENGINEERING - FINAL | Partial Approval | COMPLETE ALL ITEMS THAT HAVE BEEN PREVIOUSLY NOTED OR PROVIDE DOCUMENTATION THAT THESE HAVE BEEN APPROVED AND ACCEPTED BY THE ZONING DEPARTMENT. | |
| 04/08/2003 | ENGINEERING - FINAL | Partial Approval | 1) COMPLETE ALL SIDEWALKS AS SHOWN ON THE APPROVED PLANS THROUGHOUT THIS SITE 2) INSTALL THE 6-FOOT CMU WALLS AS NOTED ON THE APPROVED PLANS W/DRAINAGE OPENNINGS 3) THE TRASH ENCLOSURE HAS NOT BEEN CONSTRUCTED PER THE APPROVED PLANS. MAKE ALL CORRECTIONS AS SPECIFIED ON THE PLANS 4) REPAIR DAMAGED SIDEWALKS AS NEEDED ON THIS SITE 5) COMPLETE THE CURB INSTALLATIONS ON THIS SITE ADJACENT TO BUILDING #4 6) INSTALL BICYCLE PARKING AS NOTED ON THE APPROVED PLANS COMPLETE THIS SITE AS IT IS SHOWN ON THE APPROVED PLANS OR HAVE CHNAGES APPROVED BY CRAIG GROSS/ZONING AND MATHEW FLICK/ENGINEERING PRIOR TO SCHEDULING THE RE-INSPECTION OF THIS SITE. IF THERE ARE ANY QUESTIONS CONTACT DAVID ROBERTS 349-5845 AND I WILL GLAD TO ANSWER ANY QUESTIONS FOR YOU. |
|
| 01/07/2002 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED FINAL NOT TO BE GIVEN UNTIL ALL ENGINEERING ITEMS ARE COMPLETE AND RE-INSPECTED. SEE INSPECTION SHEET FOR THE ORIGINAL PUNCH LIST ITEMS. |