Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T00CM05258

Parcel: 133262970


Addresses:

575 N SARNOFF DR

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
11/20/2000 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection 0000*
11/16/2000 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection 0999*/1. LAYOUT SETBACKS DO NOT MATCH APPROVED PLOT PLAN 2. INT. BEARING FTG. REQUIRES 1-#4 REBAR (MUST BE INTERCONNECTED WITH OTHER REBAR OF EXT. FOOTINGS. 3. CANNOT LOCATE FTG. DETAIL FOR FIREPLACE.
11/14/2000 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection 0999*/1. SHOW F/P ON PLOT PLAN 2. SHOW F/P FTGS. 3. TIE VERTICLE (RACK) STEEL IN THE POSITION OF POUR 4. PROVIDE GRADE PINS.