Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/12/2002 |
ENGINEERING - FINAL |
|
Approved |
|
| 02/22/2002 |
ENGINEERING - FINAL |
|
Partial Approval |
COMPLETE THE INSTALLATION OF THE TRASH ENCLOSURE ON THE NORTH SIDE OF THE CAFETERIA. |
| 01/28/2002 |
ENGINEERING - FINAL |
|
Partial Approval |
TEMPORARY C OF O APPROVED, FINAL NOT TO BE GIVEN UNTIL THE DRAINAGE CHANGES HAVE BEEN NOTED ON AS-BUILT PLANS, AND THE SOLID WASTE CHANGES ARE APPROVED. THE CHANGES THAT HAVE BEEN MADE NEED TO BE APPROVED BY RENEE DUARTE FROM THE SOLID WASTE DEPARTMENT. |
| 10/19/2001 |
ENGINEERING - FINAL |
|
Partial Approval |
TEMPORARY C OF O APPROVED AT THIS TIME. ON-SITE SOLID WASTE DUMPSTERS, AND DRAINAGE ITEMS NEEDS TO BE CHECKED PRIOR TO THE FINAL RELEASE. |