Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/20/2001 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/1. 1 RANGE CIRCUIT FOR EXISTING HOUSE, AND ONE RANGE CIRCUIT FOR NEW BLDG., THESE TWO CIRCUITS NOT LISTED ON LOAD CALC. 197 AMPS PER PLAN WITHOUT RANGE CIRCUITS? HVAC EQUIP. 30/30 FUSED NOT ON NEW BLDG. CALCS. 2. NEED INSULATION, AND STUCCO CERTIFICATIONS FROM INSTALLERS. |