Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/03/2001 |
ELECTRIC - TEMP POWER FOR TEST |
|
Approved |
OK TO CLEAR TEC. |
| 10/01/2001 |
ELECTRIC - TEMP POWER FOR TEST |
|
Not ready for Inspection |
FOR TEMP POWER FOR MAIN SERVICE 1.) INSTALL GROUNDING BUSHING ON CONDUITS AHEAD OF OVER CURRENT PROTECT 99 NEC 250-94 2.) SCRAPE BEHING ALL GROUND LUGS ATTACHED TO EQUIPMENT 3.) UFER & NEUTRAL ISOLATED FROM EQUIPMENT ENCLOUSRE 4.) ADDRESS SERVICE PERMANENTLY 110-24 N.E.C 5.) TIE CT CAN TO GUTTER WITH SAME JUMPER AS #3. |