Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/10/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 04/04/2001 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/FROM LAST INSP. MISSING H.D. NOT 2 P.A.'S MISSED SHEAR WALL FRONT BEDROOM. |
| 04/02/2001 |
FRAMING |
|
Not ready for Inspection |
1. MSSING H.D. NUT WASHER. 2. MISSING 2 P.A. STRAPS=H.D. EQUAL FRONT WALL BEDROOM. |
| 03/28/2001 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/1. ROOF/NAIL RESOLVE SHEATHING PROBLEM. 2. H.D. NUTS MISSING. 3. ADD HEADER TRIMMERS STUD CUT KIT. OVEN VENT. 4. ADD STUD M/BATH DIVERTER. 5. MISSED TWO P.A.'S FRONT BEDROOM. 6. #4 SHEAR WALL GARAGE ADD MISSING PLATE BOLTS, SHEAR FROM OVERHEAD DOOR TO FURNACE ALCOVE SEE PLAN. |