Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 12/20/2000 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 12/19/2000 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/1. ITEMS #4,5 PART OF #6. 2. PROVIDE APPROVED STRAPS FOR ABS VENTS AT HORIZONTAL RUNS PLUMBERS TAPE NOT APPROVED. 3. REMOVE COMBUSTIBLE MATERIAL FROM HOT WATER FLUE VENT. 4. INSTALL TUB/SHOWER. |
| 12/15/2000 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/1. BLOCK SHEATHIN UNDR MECHANICAL RUNNING. 2. STRAP BEAM HORIZONTALLY AT MASTER STRUCTUAL WALL. 3. PROVIDE CLEANOUTS AS PER PLAN. 4. SEAL FLOOR PENETRATIONS OVER 1/4 AT KITCHEN DRAIN SEAL FLOOR PVC FOR ELECTRIC ADJACENT TO KIT. DRAIN. 5. STRAP OVER KNOTCH DBL TOP PLATE AT CONDENSATION. 6. MAKE UP ELECTRICAL ROMEX AT FURNACE PROTECT ELEC. ROMEX THRU OUT WITHIN 1/4 FROM EDGE OF STUD. |