Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2002 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 05/31/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ALL CONTINOUS FOOTINGS | |
| 05/30/2001 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*TRASH ENCLOSURE FOOTINGS THREE CONT. FTGS. AT DRYING APRON.WEST CONT. AT WASH BAYS. |
|
| 05/29/2001 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*1)F-1 FOOTING TO BE 18" THICK.2)CHECK THE WIDTH OF FOOTINGS.3)PROVIDE DOORS (ARRANGE THE VERTS.) CORNERS,T,JAMBS.4)PROVIDE DETAIL 107, TRENCH DRAIN. |