Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T00CM04813

Parcel: 114468150

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Permit Number - T00CM04813

Inspection Description - EXT METAL CLIPS/EXT SHEATHING

Inspection Status - Approved

Date Description Inspector Results Comments
01/24/2001 EXT METAL CLIPS/EXT SHEATHING Approved IVRS - Inspection 0000*
01/23/2001 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection 1. MISSING WALL BRACING/ REQ'D.-NO MORE THAN 8' FROM EA. CORNER. NO MORE THAN 25' O.C. 2. NAIL ALL RED MARKS ON ROOF DECK. 3. CONNECTION GARAGE ROOF TO MAIN HOUSE?
01/18/2001 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection IVRS - Inspection 0000*/1. THE 2ND ANGLE WALL FRONT BEDROOM FROM LAST INSP. 2. H.D. NUT NOT TIGHT GARAGE SHEAR WALL. 3. REAR SHEAR WALLS NOT TIED TO ROOF. 4. MOVE WATER FLUE. 5. SCUPPERS NOT BLOCKED CORRECTLY. 6. USE A WIDER SHIM AT TJI DIAGONAL WALL SHIM IS BROKEN. 7. CABIN TIED MISSING REAR CORNER USE METAL STRAP TO SECURE. 8. CUT THE RIDGE OFF BEVEL PLY (CRICKET GARAGE ROOF).
01/11/2001 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection 1. WALLS NOT TIED AT FRONT VERTICAL BEDROOM.(2 PLACES). 2. ROOF DECK SEE ORANGE MARKS. 3. REAR SHER NOT NAILED. 3. FRONT DOOR PLATE. 4. NEED FULL BEARING UNDER BEAM #3 BEDROOM. 5. TIE ANGLE WALL TO TJI USE H2.5 AND WEB STIFFNER. 6. RANGE DUCT ADD 2 X 4 ON TOP OF EXISTING SOFFITT 2X. 7. H20 HEATER FLUE AT THE CRICKET SEAM MOVE IT. 8. SEE ORANGE MARKS ON FLR.
01/04/2001 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection 0999*/1. NEED TO WALK THIS HOUSE WITH SOMEONE IN SUPERVISION. 2. RE-INSPECTION FEE DUE BEFORE NEXT INSPECTION.
12/29/2000 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection IVRS - Inspection 0000*/1. NEED SHEAR TRANSFER AT GARAGE SHEAR WALL TO ROOF. 2. PLATE BOLTS NEEDED AT DIAGONAL WALL FRONT ENTRY. 3. SECURE GARAGE BEAM. 4. PARAPET ON ROOF NAIL OFF SHEATHING. 5. SHIM UNDER TJI TAKE AS MUCH WT. OFF ENTRY BEAM AS POSSIBLE.