Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 02/23/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 02/01/2001 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/1. NEED SHOT PINS 6" O.C. AT SHEAR WALLS. 2. MOVE H20 HEATER FLUE AWAY FROM COMB. AND PLUMB IT. 3. NEED ROMEX CONNECTORS AT METAL BOXES 4. MECH PLAN CHANGED NEED CITY APPROVAL (UNITS MOVED TO ROOF TOP NO ROOM IN GARAGE FOR DUCTS, FRAMING MEMBERS CUT, TJI'S ECT.) 4. BLOCK ALL MECH VENTS 5. F/PLACE HEARTH EXT. MIN 12", 30 DEGREE ANGLE F/P SIDES SEE SPECS. 6. DUCT CIELING ENTRY TO BEDROOM NOT SECURED. 7. NEED CIRCUIT FOR JACUZZI AND INSP. HOLE. |
| 01/23/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0950*/1. HOLD DOWN ANCHOR BOLTS NOT INSTALLED. 2. SHEAR WALL 3 REQUIRES ANCHOR BOLTS PER SILL PL.ATE. 4. PLAN CALLS FOR TJI JOISTS. BCI JOISTS INSTALLED-REVISE PLAN AND HAVE APPROVED FOR CHANGE. 5. BOTTOM CHORD OF BCI CUT AND REMOVED FOR A 2 1/2FT. SECTION PROVIDE C.O.T. APPROVED ENGINEERING REPAIR. |