Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/19/2001 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 01/17/2001 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/1. BOND WIRE FOR GAS PIPE NEEDS TO BE ACCESSIBLE. 2. PAINT EXTERIOR PVC AT IRRIGATION. 3. PATCH HOLES EXTERIOR SEE AREA AT DISCONNECT 1/2" HOLE IN WALL. 4. PROVIDE COVERS FOR CLEAN OUTS 5. INSTALL FACE PLATE AT ALL SWITCHES/RECEPS. 6. 30" CLEARANCE IN FRONT AND HEAD NOT PROVIDED. 7. GAS LINE NOT CONNECTED AT AIR HANDLER UNIT. 8. YOU NEED TO APPEAL TO C.O.T. BUILDING OFFICIAL FOR APPROVAL FOR CLEARANCE IN ATTIC. |
| 10/26/2000 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0950*/1. "SVC PANEL" CIRCUITS NOT IDENTIFIED. 2. POST TENSION NOT IDENTIFIED AT PYW. 3. BLOW BACK INSULATION FROM SCREENED EAVE VENTS. 4. PROVIDE SOLID FOUNDATION UNDER AC COIL. 5. SEAL PENETRATION AT REAR GFCI OUTLET 6. CARPET INSULATION IN PROGRESS UNABLE TO ENTER. 7. ADDRESS NOT POSTED. |