Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/21/2001 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000* |
| 03/19/2001 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*/1. SEWER LINE MUST BE A MINIMUM OF 12" BELOW GRADE TO TOP OF PIPE AT EXIT OF BUILDING PER UPC SECTION 718.3 PRESENTLY ABOVE GRADE. YOUR PLAN IN SECTION A/4 SPECIFIES 2'-6" TO GRADE FROM FINISHED FLOOR. AND SEWER IS ONLY 2'4" TO PLAN AND CODE. IF YOU DESIRE TO BACKFILL YOUR LOT TO 12" ABOVE SEWER THEN YOU MUST REUSE YOUR PLAN AND HAVE IT APPROVED BY CITY OF TUCSON. NEXT FAILING WILL BE CHARGED A REINSPECTION FEE. |
| 03/16/2001 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*/1. SEWER LINE MUST BE A MINIMUM OF 12" BELOW GRADE TO TOP OF PIPE AT EXIT OF BUILDING U.P.C. SECTION 718.3. PRESENTLY ABOVE GRADE. |