Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/11/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 10/05/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0145*/1. NAIL SHEAR TRANSFER PANELS DOWN FORM ROOF WITH 16D NAILS (AT LEAST 4 NAILS PER PNL.). 2. CHECK PANELS ON NORTHSIDE OF ROOF-SOME NEED NAILING. 3. ADD ANCHOR BOLTS ALONG FLOOR PLATE WHERE NEEDED WITHIN 12" OF EACH END OF PLATES. TIGHTEN NUTS--ADD LARGE WASHERS WHERE HOLE IN FLOOR PLATE IS TOO LARGE FOR SMALL WASHERS. NUT AND WASHER SHOULD NOT SINK INTO WOOD. 4. ADD LONG STEEL STRAPS ACROSS BUTTED--PEAK--TOP PLATES. TIE WALL SECTIONS TOGETHER. 5. 'T' WIND BRACE SHOULD BE NAILED IN CENTER GROOVE NOT WINGS. 6. GARAGE SHEAR PANELING NEEDS NAILING AT SOME STUDS. |