Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2001 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 04/18/2001 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 03/06/2001 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* OK FOR GAS BOND HAS BEEN POSTED. LAST INSP. ON JOB PLEASE PROVIDE GAS CARD PLEASE PROVIDE FLASHING ON 2" VENT. TAIL PIECE AT TRAP NOT OVER 24" STAND PIPE NOT OVER 30" ROOF TOP UNITS NOT INSTALLED AT THIS TIME |
| 03/05/2001 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999* 1) GAS NEEDS TO BE TESTED CONDENSATE DRAINS NEED TO BE CONNECTED GAS CONNECTIONS ON ROOF TOP INCOMPLETE 1/2" WATER SUPPLY TO ROOF TOP UNITS INCOMPLETE |
| 02/28/2001 |
PLUMBING - FINAL |
|
Not ready for Inspection |
NO ONE ON JOB NO CHANGES HAVE BEEN MADE PAY REFEE AND CALL AGAIN |
| 02/27/2001 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* NO CHANGE FROM LAST INSP. NO ONE ON SITE |
| 02/23/2001 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* GAS ALL FIXTURES TO BE INSTALLED AT TIME OF FINAL. FINAL NOT READY NEED REVISED APPROVED PLANS ON DRAIN LINES FOR COOLER OVER FLOW |
| 02/22/2001 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* PLEASE PROVIDE APPROVED REVISED PLANS |