Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/16/2000 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 11/15/2000 |
BUILDING - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/1. ELECTRICAL OUTLETS INSTALLED AT ISLAND UNDER COUNTER TOP EXCEEDING 6 INCHES. 2. GABLE BACK OF HOUSE STUCCO PATCH INCOMPLETE. 3. PAINT EXTERIOR PVC PIPE. 4. PROVIDE 6 INCH CLEARANCE FROM TOP OF SLAB TO FINISH GRADE AS PER F. PLAN. |
| 11/13/2000 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/1. ROUGH GRADE EAST SIDE OF BUILDING DOES NOT DRAIN THROUGH VENT BLOCK. 2. ROUGH GRADE AT BACK OF HOUSE NOT COMPLETE. 3. PROVIDE POST TENSION TAG AT WATER SHUT OFF. 4. PROVIDE 1/4" MESH AT BOTH C AND R VENTS. 5. PROVIDE GABLE END VENT AS PER PLAN SEE 7C AT BACK OF HOUSE. |