Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/09/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 06/22/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) CURVED WINDOW REQUIRES CONTINOUS AND SOLID 2 X 6 HEADER, OK TO DRY IN |
| 06/11/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 06/04/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999*/ 1) 2 X 8 BLOCKING REQUIRED EACH END OF RAFTER 2) RAFTRERS SPACED IN EXCESS OF 24" AT EAST END 3) HOLD DOWNS MUST BE NAILED TO FULL LENGTH DOUBLE STUD 4) ROOF SHEATHING MUST BE INSTALLED PER PENDICTULAR TO RAFTERS, NAIL ROOF SHEATHING AT 6" ON CENTER, ENDS AND EDGES AT 12" ON CENTER IN FIELD WITH MINIMUM #8D NAILS 5) NAIL EXTERIOR SHEATHING ON ALL FRAME MEMBERS 6" AND 12" |