Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/17/2000 |
FRAMING |
|
Approved |
IVRS - Inspection 0000*/BUILDER AND/OR SUPERINTENDENT RESPONSIBLE TO COMPLY WITH ITEM #1 AND #9 ABOVE PROVIDING APPROVED FHA STRAPS AND NAILING PER UBC 2326.11.7. |
| 11/15/2000 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/1. PROVIDE BOND TO GAS. 2. INSTALL FHA STRAPS AT DRYER DUCT PER UBC. 3. A/C CONDENSATION LINES NOT INSTALLED. 4. PROVIDE UPLIFT STRAPS AT B-4 BEAM AND HORIZONTAL STRAPS AT BOTH TOP PLATE. 5. PROVIDE STRAPS TO BOTH DOUBLE TOP PLATES AT B-5 HEADER AND PROVIDE POSITIVE CONNECT FOR PONY WALL OVER HEADER. PROVIDE CLIPS TO POST AT SOLE PLATE. 6. CLIP POST AT SOLE PLATE OF BAY WINDOW. 7. BLOCK ALL MECHNICAL 3 SIDES. 8. PROVIDE CORRECT BEARING WALL FRAMING, (AND BEARING), AND CLIPS AT BARCK OF PANTRY DOOR, NOTCHES CUT UNDER TRUSS AT 2 X 6 WALL NO BEARING. 9. PROVIDE APPROVED FHA STRAPS AT EXHAUST HOOD WALL (BOTH SIDES). |