Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2001 | BUILDING PRE-SLAB | Approved | ||
| 11/08/2000 | BUILDING PRE-SLAB | Partial Approval | BLD ADDITION | |
| 11/07/2000 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection 0000* SAME NOTES AS ABOVE INSPECTION |
|
| 11/02/2000 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection 0000* DETAIL 3 ON S-1 REQUIRES #3 TIES AROUND VERT REINF (SEE ALSO DTLS, 1 AND 2) PROVIDE REINF PER DTL 5 ON 5-1 AND DTL. 3 ON S-2 PROVIDE HAIR PINS AT LINE G AND ROW 1 PROVIDE TOP MAT AT F-3'S THE DESCRIPTION OF THE FLOOR ON THE FOUNDATION PLAN APPEARS TO HAVE BEEN CHANGED |